Flashing,Trims & Gutters

TUFGUARD Flashings, trims and gutters can be matched with the panel exterior facer or customized as per the project requirement Flashing & Trims to be lapped at joints as follows, unless specified otherwise.

Vertical and sloping flashings/trims: End laps to be the same as for adjacent sheeting.

Horizontal flashings/trims: End laps to be 150 mm, sealed and where possible arranged with laps away from the prevailing wind.

Flashings/Trims should be fixed to structure wherever there is conjunction with adjacent panels or wall or roof or sheeting.

Contact Us to Purchase
Resources

 Content

Download

 Certificate

Download

Contact Us

Subscribe to stay up to date on all the latest news